Bonding of Metal-CFRP with Big Heads

Are you experiencing a complex bonding process? Learn in our success story how you to simplify your workflow thanks to the visual process control. 


Customer Requirements

  • Process simplification
      - Currently primer application on both substrates is required
      - Flashing off the primer
      - Approx. 45 minutes to reach handling strength
  • Reduction of process error sources

Kisling Solution: 1675

Methacrylate Structural Adhesive

  • Gap filling up to 10 mm
  • Minimum adhesive layer 75 µm (spacer)
  • Colour change during curing enables visual process control
  • Low odour
  • DIN EN 45545-2 certified

Customer Benefits

  • Inline quality control: Colour change of adhesive indicates initial handling strength
  • Handling strength in less than 5min 
  • No primer required
  • Low odour - less smell in the production facility

Weitere Informationen

DeutschEnglisch
Product flyer
Focus flyer Lightweight Materials & Composites
Overview brochure

Fixture Time Indicator

Wir verwenden einen Service des Drittanbieters YouTube, um Videos einzubinden. Betreiber der Seite ist Google Ireland Limited („Google“). Dieser Service kann Daten zu Ihren Aktivitäten sammeln. Bitte lesen Sie die Datenschutzerklärung durch und stimmen Sie der Nutzung des Service zu, um dieses Video anzuzeigen.

Video anschauen